Applicate at building exterior wall insulation
On the premise of ensuring to meet the requirements of energy saving and heat preservation, the strength can meet the standard requirements of exterior decoration. There is no need for another protective layer or waterproof layer, which is constructed like ordinary cement mortar. It can be directly drilled and painted on the insulating layer.
Applicate at building interior wall insulation
On the premise of ensuring to meet the requirements of energy conservation and heat preservation, the strength can reach the standard of interior decoration, and can be directly decorated on the heat preservation mortar; the fire protection grade can completely meet the requirements of fire protection and fire prevention. Moreover, the construction is simple and convenient, which is the same as the traditional ordinary mortar construction technology.
General provisions
The construction scope and thickness of thermal insulation of microcrystalline inorganic thermal insulation mortar external wall (inner wall) shall meet the design requirements.
The construction unit shall carry out the construction according to the product description of the facrory
The construction unit should make a sample before carrying out large-scale construction.
construction
Material preparation: when the required materials enter the site, they shall be registered and inspected in accordance with relevant regulations, and shall be properly stored and managed.
Water and electricity preparation: distribute the power supply and water source according to the construction demand, and the water quality should conform to 《water standard for concrete mixing》JGJ63.
Tool preparation: before construction, the tools should be prepared in place, and the completeness of the tools and the debugging of the equipment should be carried out.
Staff training: the point is on products, technology, construction steps, precautions, safety measures and civilized construction.
Construction conditions: all embedded parts of the wall must be installed before this construction.
Protection of finished products: protect all embedded parts and management on the construction site to avoid damage or damage during construction.
Check and accept the base before construction, the base should be cleaned up, its surface flatness, verticality should meet the corresponding specification requirements.
When the microcrystalline inorganic thermal insulation mortar is used in the renovation project of the building, the base must be solid, and the powder of the original decoration surface should be cleaned.
maintain
Spray water and maintain it for more than seven days after painting to prevent the paste from reducing its strength and surface cracking.
| 亚洲国产精品中文视频 | 91日韩精品一区二区三区小杨幂 | 亚洲精品国产精品乱码 | AV无码一区二区三区 | 亚洲色在线v中文字幕蜜桃一区 | 成人网站免费观看www打球中国 | 无码粉嫩小泬抽搐白浆免费 | Chinese搡老女人 | 成人精品一区二区三区电影 | 日韩aⅴ精品无码一区二区三区 | 国产一级A片一夜情毛片 | 3d动漫啪啪精品一区二区免费 | 一级a一级a爱片免费免免高潮 | 成人免费无遮挡黄H网站在线观看 | 91精品人人妻人人澡人人爽人人精东影业 | 91无码人妻精品国产色情竹菊影视 | 91福利姬液液流奶喷白浆 | 波多野结衣在线播放 | 红桃视频成人A片免费观看 蜜桃av秘 无码一区二区 | 亚洲少妇激情海角社区 | 少妇一级婬片免费放1一6 | 草1024榴社区成人影院入口 | 中文字幕精品一区久久久久 | 四虎影成人Av在线观看 | 老牛成人亚洲精品777777 | 欧美成人A片久久久电影 | 人人妻人人澡人人dvd | 91色视频免费观看 | 免费毛片视频在线播放 | 初尝黑人嗷嗷叫中文字幕91精品 | 欧美激情三级网址在线观看 | 四川寡妇BBB搡BBB爽爽爽 | 九一在线观看福利姬九一在线 | 一级免费视频在线观看 | 人妻体体内射精一区二区三区 | 色婷婷AV久久久久久久 | 无码粉嫩小泬抽搐白浆免费 | 国产精品无码一区二区三区香奈 | 超清久久啊无码小视频 | 亚洲AV无码乱码国产精品果冻 |